- marine engines
- railway engines
- engines for the oil and mining industry
- diesel and gas generators
- container generators
- hybrid energy solutions
We provide supply, installation supervision, commissioning, warranty and post-warranty service of energy products
We will deliver and start the equipment
We provide a full range of turnkey solutions, offering modular cogeneration plants in container design that ensure quick and economical deployment in any location. Our main advantages are the high professionalism of the team and the international experience of our partners.
- the highest compression ratio
- the highest efficiency
- reduced fuel consumption
- electronic engine management and digital diagnostics
- conversion of diesel engines to HVO and e-methanol
- conversion of gas engines to gas mixtures with hydrogen and 100% hydrogen
- hybrid power units for diesel locomotives
- kinetic battery, industrial batteries for energy storage and control systems for microgrids
📍 When released from the factory, each gas piston unit passes the FAT - Factory Acceptance Test - and receives a certificate.
📍 The standard warranty from the manufacturer is 1 year. In some cases, it can be extended up to 3 years
✔️ the contract for scheduled maintenance is concluded directly with us, ELENG LLC
✔️ cost - is calculated individually, in accordance with the manufacturer's maintenance schedule.
✔️ equipment availability throughout the year - above 97%
✔️ is performed by specialists trained at the authorized mtu training center at the plant in Augsburg, Germany
✔️ we purchase all the necessary (and critical) spare parts for your plant that will be needed for service during the period for which the contract is signed at our warehouse in Ukraine. This is maximum availability + best prices
✔️ does not include after-sales service
✔️ covers engine, frame, generator, MIP/MMC
✔️ can be purchased for both new and used machines/completed machines that have been stored in the warehouse for more than a year
✔️ can be purchased for a period of 6 months to 5 years (1 step - 6 months). This can be done within 3 months from the date of commissioning up to 6 months before the end of the warranty period.
✔️ is calculated individually
1. Meeting and selection of a gas piston unit based on mini-energy audit on site
2. Identification of the need for additional options/services
3. Formation of a commercial offer and feasibility study
4. Discussion and correction (if necessary) of the CP
5. Signing the contract and making an advance payment
6. Preparatory work (optional)
7. Supply of the GPU/CGU, supervision of installation and commissioning
8. Instruction of the Customer's personnel
9. Service maintenance according to the manufacturer's regulations + 24/7 dispatching
Microgrids - build a power system
for your own needs!
- Gas turbine generators + energy storage systems
- Gas turbine + energy storage systems
+ solar panels, etc.